RECOMMENDATIONS SURVEY
In general this building
(structure) functions well for the purposes of its membership. However,
as the membership grows and more individuals make more use of the
structure and its amenities important alterations/ upgrades should be
considered.
As noted throughout the scope
of this study the areas of concern offer a number of solutions. The
costs in Part II – Proposed Solutions and Their Estimated Expenses,
provide a cost breakdown describing the elements which includes
materials, labor, overhead and profit. Estimates do not include
allowances for future escalation, cost of money or Architecture and
Engineering Fees. Included however at the end of the recommendation
summary is a 5 % adjustment for Spring Construction 2005.
The following is a summary of
the recommendations from SD Atelier – Architecture, L.L.C., for each of
the areas of concern. Each number has been rounded off to the nearest $
100 from Section 2 on account of the schematic nature of the feasibility
study. Areas where options were offered – SD Atelier - Architecture,
L.L.C. has prioritized the option in their professional opinion as most
appropriate. Also we narrate our professional opinions on why our
priorities are most appropriate.
3.1 Fire Protection/
Building Code Review
Still under consideration.
3.2 Second Floor
Bathroom
As
evidenced in this study, our site visits and photographs; the need for a
second floor Bathroom is obvious. Further more, having this amenity will
avoid any potential hazard which could occur from individuals waking in
the middle of the night and having to travel downstairs to gain access
to facilities – also a good nights rest – we are sure will allow for a
more alert member in the days to come.
3.3 Additional
Storage
All items in the proposed
solutions section are recommended at this point. Storage as far as the
membership is concerned is the single largest issue. The exact size and
some of the final uses – of that storage can still be debated by the
membership. Professionally speaking however – gaining this objective
will help internal operations and lessen some of the frequent management
of supplies and locations.
3.4 Exercise/ Office
Space
Allowing for this “Scope of
Work” to occur will also allow for better segregation of Office
(private) functions from public functions and give this organization
more of a business structure; while maintaining the “family” personal
connection.
3.5 Site Traffic/ 3 Additional Parking (Trench Drains)
As enclosed at the end of this
section the feasibility/ opportunity to provide parking at the Route
146A (Building front) is remote. This would entail the membership to
purchase and amended.
3.6 Verify Zoning Setbacks for Exterior Additions
See
1.6 narrative – no cost estimate is associated with this “scope of
work.”
3.7 Relocation of Present Training Facility/ Space
It was determined very early on
that the present location and use of this space – really could not be
accommodated in any other location of the building without being
prohibitive – therefore this scope of work was eliminated.
END OF RECOMMENDATIONS SURVEY
|